Projects
Water System Improvements
Blair Township, MI
After evaluating the growing demands for water and fire fighting in Blair Township, Gosling Czubak provided design and permitting services for a new 450 GPM water supply well, a 500,000 gallon ground storage reservoir and 11,000 feet of 16" water main to connect the new reservoir to the water system in the Township. To accommodate future demands, the reservoir was designed to be expendable to 1,000,000 gallons. Additionally, a new well field capable of producing 1,600 GPM was identified and a new water treatment plant was planned. Gosling Czubak also provided surveying, geotechnical engineering, and construction materials testing for the project.