Skip to Main Content

Projects

Sewer Collection System

Blair Township, MI

Gosling Czubak provided engineering services from inception to the completion of Blair Township’s sewer system. Work included planning, preliminary engineering, facilitating the public process, designing, permitting, assisting development of special assessment and rate structures, acquiring easements, and providing site engineering, construction staking and construction materials testing.  The sewer system includes 10 miles of gravity sewer, 5 miles of force main and a pumping station expandable to 1 MDG.  The total project cost was approximately $4.5M.