Skip to Main Content

Projects

Arcadia Dunes Barrier Free Boardwalk and Overlook

Arcadia, MI

Gosling Czubak assisted the Grand Traverse Regional Land Conservancy (GTRLC) to advance trail development at a series of key land preserves. The focus of the planning and preliminary design development was to create accessible trail links from the trailhead to the top of the 300' bluff. Challenges included steep slopes, sensitive ecological areas, difficult construction access, poor soil conditions. Design elements included trail head and amenity design, extensive boardwalk and ADA crushed stone trail areas and detailed opinion probable cost development.

Gosling Czubak staff engaged with 8-10 key staff from the GTRLC and facilitated numerous review and development sessions. Field investigations, pre-staking of proposed alignments, topographic survey, and geotechnical investigation services were also integrated in each project scope. The project was awarded the Builders Exchange of Northwest Michigan Award of Excellence in Construction.