Skip to Main Content

Projects

Our Projects

Herman Park Tennis Courts

Gosling Czubak worked with Suttons Bay Township to make multiple improvements to Herman Park.

Residential Building Support

Several home builders rely on Gosling Czubak as their comprehensive source for geotechnical soil reports, site plan preparation, topographical and construction staking, and quality assurance construction materials testing.

Sewer Collection System

Gosling Czubak provided engineering services from inception to the completion of Blair Township’s sewer system.

Water and Sewer Improvements

The Village of Kalkaska completed water and sewer improvements throughout the Village.

Wastewater Lagoon Facility

Gosling Czubak completed the reconstruction design of an existing 97.8 Million gallon (MG) per year wastewater lagoon facility in Markey Township.

New Sequencing Batch Reactor

Gosling Czubak completed design of a new 30,000 GPD sequencing batch reactor plant with tertiary filtration and a finescreen, which discharged to rapid infiltration basins. 

Brutus Road Bridge over Maple River

This crossing of Maple River was in need of improvement with undersized twin culverts.

Benzie Boulevard Streetscape

Gosling Czubak provided design and construction engineering and contract administration services for this road resurfacing and streetscape improvement project along the main downtown of the Village of Beulah.

Watermain Replacement

Gosling Czubak designed replacement of watermain beneath several sections of Village street in Elk Rapids. Work also included construction inspection and construction materials testing.

Glen Arbor Township Park

Landscape design and project management for a new universally accessible park for all ages and abilities in Glen Arbor.

Tamarack Loop Boardwalk Trail Reconstruction

Gosling Czubak provided landscape design and project management for the replacement of 0.3 miles of boardwalk at Grass River Natural Area (GRNA). The new boardwalk is ADA accessible and long-lasting.

Arcadia Marsh UA Boardwalk Trail

Gosling Czubak assisted the Grand Traverse Regional Land Conservancy in the design of a ¾ mile boardwalk through the 273 acre marsh preserve, which allows access for all abilities to immerse themselves in the unique marsh environment.

Pyatt Lake Natural Area UA Boardwalk

Gosling Czubak worked with the Grand Traverse Regional Land Conservancy to design a replacement boardwalk trail system and overlook at Pyatt Lake Natural Preserve.

Interlochen State Park Wastewater Feasibility Study and Improvements

Gosling Czubak was selected and completed the preliminary engineering study for the viability of the old wastewater facility at Interlochen State Park.

1957
Our Year of Foundation
+40
Employees
6
Main Services
67
Years of Experience