Skip to Main Content

Projects

Our Projects

Merit Energy Company

When Merit Energy Company of Dallas, Texas was looking for a consulting firm to guide them through the myriad of State of Michigan regulations and implement Merit Energy’s environmentally responsible business plan, they selected Gosling Czubak.

Commercial Property Environmental Assessment

Phase II ESA activities, including soil and groundwater sampling, as well as a ground penetrating radar (GPR) survey for suspected underground storage tanks.  

Four Corners Remediation System

Gasoline and fuel releases were confirmed at four different gas stations at Front and Division Streets in Traverse City. Gosling Czubak designed a remediation system to clean the site. 

Torch Lake Bathymetric Survey

Working with the Michigan Department of Natural Resources, Gosling Czubak completed a bathymetric survey of Torch Lake to assist in determining the feasibility of a new boat access site (BAS) on the west side of the lake. 

Environmental Consulting

Gosling Czubak provided permitting and compliance services to various mining operations throughout the State of Michigan.

Groundwater Modeling

Gosling Czubak conducted a remedial investigation at a crude oil central production facility. Soil and groundwater were investigated to identify and characterize potential sources of contamination. 

Clare's Country Corner

Soil and groundwater were contaminated with hydrocarbons from historic releases from underground storage tanks. Gosling Czubak completed site characterization work including soil and groundwater sampling.  

Air Stripping Remediation System

Petroleum releases from an oil and gas central production facility in Otsego County, MI impacted soil and groundwater at the site. 

Golf Course Acquisition Assessment

Gosling Czubak provided a Phase I and II Environmental Site Assessment (ESA).  The Phase I ESA reveled evidence of recognized environmental conditions (REC) associated with the subject property.

Mini Mart LUST Investigation/ Remediation

The UST excavation was dewatered as part of removal and new tank installation activities. Contaminated groundwater was treated with a two-stage granular activated carbon system with the treated water discharged, under an NPDES permit, to the Elk River.

Marion Mini Mart LUST

During site upgrades an abandoned leaking underground storage tank was discovered.  Gosling Czubak conducted an initial and final assessment to determine the extent of soil and groundwater contamination.

Agribusiness Food Processor

Gosling Czubak conducted a comprehensive hydrogeologic and remedial investigation for a fruit processing facility. 

1957
Our Year of Foundation
+40
Employees
6
Main Services
67
Years of Experience