Sewer Collection System

Gosling Czubak provided engineering services from inception to the completion of Blair Township’s sewer system.

Water and Sewer Improvements

The Village of Kalkaska completed water and sewer improvements throughout the Village.

Wastewater Lagoon Facility

Gosling Czubak completed the reconstruction design of an existing 97.8 Million gallon (MG) per year wastewater lagoon facility in Markey Township.

New Sequencing Batch Reactor

Gosling Czubak completed design of a new 30,000 GPD sequencing batch reactor plant with tertiary filtration and a finescreen, which discharged to rapid infiltration basins. 

Spencer Road / CR 571 Reconstruction

Gosling Czubak provided full time construction engineering services for this 3.7 mile hot mix asphalt road resurfacing project.

Benzie Boulevard Streetscape

Gosling Czubak provided design and construction engineering and contract administration services for this road resurfacing and streetscape improvement project along the main downtown of the Village of Beulah.

Watermain Replacement

Gosling Czubak designed replacement of watermain beneath several sections of Village street in Elk Rapids. Work also included construction inspection and construction materials testing.

Lake Kathleen Dam Siphons

Gosling Czubak designed a temporary water lowering system for a dam removal project on the Maple River and Lake Kathleen in Emmet County. The result was six 24" diameter siphon pipes.  

Glen Arbor Township Park

Landscape design and project management for a new universally accessible park for all ages and abilities in Glen Arbor.

Arcadia Marsh UA Boardwalk Trail

Gosling Czubak assisted the Grand Traverse Regional Land Conservancy in the design of a ¾ mile boardwalk through the 273 acre marsh preserve, which allows access for all abilities to immerse themselves in the unique marsh environment.

Pyatt Lake Natural Area UA Boardwalk

Gosling Czubak worked with the Grand Traverse Regional Land Conservancy to design a replacement boardwalk trail system and overlook at Pyatt Lake Natural Preserve.

South Higgins Lake State Park Campground

Road reconstruction and drainage improvements for the 400 campsite state park. Roads within the campground were crushed, shaped, and repaved along with the installation of underground storm water storage.

Kewadin Waterfront Park

Gosling Czubak assisted Milton Township with the development of a waterfront park and water trailhead on north Elk Lake, part of the Chain of Lakes Water Trail, adjacent to an existing public boat launch.

Glen Lake Community Schools

Glen Lake Community Schools began a process to upgrade and expand their outdoor sports courts and support facilities. 

Interlochen State Park Wastewater Feasibility Study and Improvements

Gosling Czubak was selected and completed the preliminary engineering study for the viability of the old wastewater facility at Interlochen State Park.