Skip to Main Content

Projects

Our Projects

St Marys Cement Plant Upgrade

Gosling Czubak was retained by St. Marys Cement and its parent company, Votorantim Cimentos, to provide engineering, testing and inspection for a 225' tall blend silo at its Charlevoix, Michigan cement plant.

McKeese Road

Gosling Czubak provided design and construction engineering services for this BIA funded road improvement project.

Ridge45 Apartments

Gosling Czubak completed construction staking for a residential apartment complex on the south side of Traverse City. Work included staking of underground infrastructure, sidewalk, curb and gutter, five apartment buildings and a pool/office building. 

Woodstone Development

Gosling Czubak has provided the surveying and engineering services necessary to develop this 80-acre single-family residential condominium community.

Eastern Elementary School

Gosling Czubak completed geotechnical, drilling and surveying services ahead of the planned reconstruction of Eastern Elementary School in the Traverse City Area Public School District. Reconstruction is planned for the summer of 2017.

Environmental Consulting

Gosling Czubak provided permitting and compliance services to various mining operations throughout the State of Michigan.

Edward C. Grace Memorial Harbor

Gosling Czubak prepared specifications for the building's removal and designed the new docks and upland facilities, including water and electrical services.

Crescent Shores Boating Access Site

The project involved redesigning the existing road end single lane small boat launch and developing an off-road parking facility on the newly acquired 11.2 acres of land adjacent boat launch site.

Arcadia Dunes Barrier Free Boardwalk and Overlook

The focus of the planning and preliminary design development is to create accessible (5% slope) trail segments as part of the existing resource area trail loops.

Great Lakes Center for the Arts

Gosling Czubak performed the Geotechnical Evaluation of the proposed building site and provided foundation recommendations to deal with the site’s mining history.  

Residential Building Support

Several home builders rely on Gosling Czubak as their comprehensive source for geotechnical soil reports, site plan preparation, topographical and construction staking, and quality assurance construction materials testing.

Residential Lakeshore Bluffs

Gosling Czubak has provided valuable geological, survey and geotechnical information and recommendations to help our neighbors through the decision-making process of risk-based erosion mitigation and management.

Ship Loader Replacement

Gosling Czubak performed the geotechnical drilling and evaluation for this project, including the deep foundation recommendations. 

New Sequencing Batch Reactor

Gosling Czubak completed design of a new 30,000 GPD sequencing batch reactor plant with tertiary filtration and a finescreen, which discharged to rapid infiltration basins. 

Brutus Road Bridge over Maple River

This crossing of Maple River was in need of improvement with undersized twin culverts.

Watermain Replacement

Gosling Czubak designed replacement of watermain beneath several sections of Village street in Elk Rapids. Work also included construction inspection and construction materials testing.

Arcadia Marsh UA Boardwalk Trail

Gosling Czubak assisted the Grand Traverse Regional Land Conservancy in the design of a ¾ mile boardwalk through the 273 acre marsh preserve, which allows access for all abilities to immerse themselves in the unique marsh environment.

Pyatt Lake Natural Area UA Boardwalk

Gosling Czubak worked with the Grand Traverse Regional Land Conservancy to design a replacement boardwalk trail system and overlook at Pyatt Lake Natural Preserve.

South Higgins Lake State Park Campground

Road reconstruction and drainage improvements for the 400 campsite state park. Roads within the campground were crushed, shaped, and repaved along with the installation of underground storm water storage.

Interlochen State Park Wastewater Feasibility Study and Improvements

Gosling Czubak was selected and completed the preliminary engineering study for the viability of the old wastewater facility at Interlochen State Park.

1957
Our Year of Foundation
+40
Employees
6
Main Services
67
Years of Experience