1.3 MGD Wastewater Treatment Plant

This new $9M wastewater treatment plant was completed by a design/build process within 18 months, from groundbreaking to substantial completion. Flow capacity at the plant is 1.33 million gallons per day.

St Marys Cement Plant Upgrade

Gosling Czubak was retained by St. Marys Cement and its parent company, Votorantim Cimentos, to provide engineering, testing and inspection for a 225' tall blend silo at its Charlevoix, Michigan cement plant.

Joining Jordan Pedestrian Pathway

Joining Jordan links the residential and commercial districts on both sides of the Jordan River. The $2.5M project was completed in large part due to a $2.2M MEDC grant.

Wastewater Treatment Plant Addition

The project consists of the construction of a new 50,000 gallon concrete surge tank, housed in a two- story building addition. The surge tank is designed to assist the existing WWTP with flows coming from a new hotel and restaurant development.

Three Mile Road

The improvements included widening to five lanes, intersection improvements, creation of a median and use of storm water best management practices. 

Water Main Extension

Gosling provided the design, permitting and construction engineering services for a water main extension to Baker College for the Charter Township of Haring.

New Wastewater Treatment Plant

Gosling Czubak designed a unique, 135,000 gallon per day oxidation ditch - activated sludge process wastewater treatment plant for Haring Township in Wexford County. 

Traverse City West Middle School

The Traverse City Area Public School System (TCAPS) retained Gosling Czubak to create a new road access to the school for buses and automobiles, to improve pedestrian circulation, and create outdoor spaces for students around the school building.

Shippy Road

Gosling Czubak completed crush and shape for approximately 1.95 miles of Shippy Road from Maple Hill Road to County Line in Kalkaska County, Michigan.

CR 651

Gosling Czubak completed resurfacing of approximately 1.75 miles of County Road 651 in Leelanau County, Michigan. 

Anderson Road

Gosling Czubak completed improvements along this stretch of Anderson Road in Emmet County, from Lears Road to US 31.

Headlands Observatory

Gosling Czubak completed a site layout and construction staking, as well as construction materials testing for the Waterfront Program facility and observatory at the Headlands International Dark Sky Park.

101 Main Street

This mixed-use development in downtown East Jordan offers high profile retail space and restaurant and kitchen space. Gosling Czubak worked in tandem with the contractor to complete concrete testing, asphalt testing, and masonry testing.

River's Edge

Gosling Czubak provided concrete testing for a three story office building in Traverse City. The building's urban location required construction of H-pile and timber lagging earth retention to support adjacent buildings and the use of a tower crane. 

Odawa Casino Parking Structure

Gosling Czubak provided geotechnical services and construction oversight for construction of the Little Traverse Bay Band of Odawa Indians’ (LTBBOI) parking structure at their casino complex near Petoskey. 

New Auto Service Center and Show Room

Gosling Czubak designed parking layout, site grading, water and sewer services, and stormwater management for a new automotive full service center and Audi/VW auto show room for Serra Automotive in Traverse City.  

Ridge45 Apartments

Gosling Czubak completed construction staking for a residential apartment complex on the south side of Traverse City. Work included staking of underground infrastructure, sidewalk, curb and gutter, five apartment buildings and a pool/office building. 

Sayler Park Boating Access Site

Gosling Czubak performed updated conceptual design from a dated plan, assisted to secure additional Waterways BAS funds and then engineered the new launch to serve smaller boats up to 22 feet in length with a single, reinforced and widened ramp.

North Bayside Park

Gosling Czubak assisted Acme Township with the redevelopment of waterfront park along Lake Michigan in Acme Township. The first phase included new walkways and linkages for future trail connectors and an enhanced beach environment.

Edward C. Grace Memorial Harbor

Gosling Czubak prepared specifications for the building's removal and designed the new docks and upland facilities, including water and electrical services.

Residential Building Support

Several home builders rely on Gosling Czubak as their comprehensive source for geotechnical soil reports, site plan preparation, topographical and construction staking, and quality assurance construction materials testing.

Residential Lakeshore Bluffs

Gosling Czubak has provided valuable geological, survey and geotechnical information and recommendations to help our neighbors through the decision-making process of risk-based erosion mitigation and management.

Sewer Collection System

Gosling Czubak provided engineering services from inception to the completion of Blair Township’s sewer system.

Water and Sewer Improvements

The Village of Kalkaska completed water and sewer improvements throughout the Village.

New Sequencing Batch Reactor

Gosling Czubak completed design of a new 30,000 GPD sequencing batch reactor plant with tertiary filtration and a finescreen, which discharged to rapid infiltration basins. 

Brutus Road Bridge over Maple River

This crossing of Maple River was in need of improvement with undersized twin culverts.

Spencer Road / CR 571 Reconstruction

Gosling Czubak provided full time construction engineering services for this 3.7 mile hot mix asphalt road resurfacing project.

Benzie Boulevard Streetscape

Gosling Czubak provided design and construction engineering and contract administration services for this road resurfacing and streetscape improvement project along the main downtown of the Village of Beulah.