Skip to Main Content

Projects

Our Projects

Residential Lakeshore Bluffs

Gosling Czubak has provided valuable geological, survey and geotechnical information and recommendations to help our neighbors through the decision-making process of risk-based erosion mitigation and management.

Agribusiness Food Processor

Gosling Czubak conducted a comprehensive hydrogeologic and remedial investigation for a fruit processing facility. 

Sewer Collection System

Gosling Czubak provided engineering services from inception to the completion of Blair Township’s sewer system.

High Definition 3-D Laser Scanning

Using 3-D laser scanning, Gosling Czubak produced detailed and accurate survey data of a historic barn's interior.

Spencer Road / CR 571 Reconstruction

Gosling Czubak provided full time construction engineering services for this 3.7 mile hot mix asphalt road resurfacing project.

Benzie Boulevard Streetscape

Gosling Czubak provided design and construction engineering and contract administration services for this road resurfacing and streetscape improvement project along the main downtown of the Village of Beulah.

Watermain Replacement

Gosling Czubak designed replacement of watermain beneath several sections of Village street in Elk Rapids. Work also included construction inspection and construction materials testing.

Glen Arbor Township Park

Landscape design and project management for a new universally accessible park for all ages and abilities in Glen Arbor.

Pyatt Lake Natural Area UA Boardwalk

Gosling Czubak worked with the Grand Traverse Regional Land Conservancy to design a replacement boardwalk trail system and overlook at Pyatt Lake Natural Preserve.

South Higgins Lake State Park Campground

Road reconstruction and drainage improvements for the 400 campsite state park. Roads within the campground were crushed, shaped, and repaved along with the installation of underground storm water storage.

Interlochen State Park Wastewater Feasibility Study and Improvements

Gosling Czubak was selected and completed the preliminary engineering study for the viability of the old wastewater facility at Interlochen State Park.

1957
Our Year of Foundation
+40
Employees
6
Main Services
67
Years of Experience